A huge project helping Europe to diversify its supply of LNG. The new LNG Terminal in Brunsbüttel started with the driving of over 250 piles into the seabed. Piles were between 1900mm and 3200mm in diameter and up to 45m long. They were placed with a tolerance of max 10mm from a distance of 250m. A very challenging job.